Kenmore 59921 Installation Guide Page 7

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 6
7
INSTALL UPPER FLUE MOUNTING BRACKET
WarrantySafety CleaningOperation Installation Service Parts
1. If a framing member is not present, drill two
5
16” diameter holes where shown. Insert dry-
wall anchors into the holes.
2. Center the bracket over the hood location and
flush with the ceiling. Make sure that the slots
of the upper flue bracket are at the bottom.
Secure the upper flue brackettothewallusing(2)
#8x1½” mounting screws.
3. Tighten the screws completely. Make sure that
the bracket is tight against the wall.
C
L
C
L
Flush with
the ceiling
Center of
installation
Upper flue mounting
bracket slots
5¾”
2
7
8
1
1
8
Recommended
distance
between
screw
holes
Ceiling
Ø 5/16
TYP.
Ceiling
Center of installation
1. GROUNDING INSTRUCTIONS
This appliance must be grounded. In the event
of an electrical short circuit, grounding reduces
the risk of electric shock by providing an escape
wire for the electric current. This appliance
is equipped with a cord having a grounding
wire with a grounding plug. The plug must be
plugged into an outlet that is properly installed
and grounded.
2. Position the electrical outlet within the space
covered by the decorative flue and where it
will not interfere with the round duct. Make sure
the outlet does not interfere with the mounting
bracket fastening area, ductwork, or where the
decorative flue touches the wall.
4”
20-3/4”
13”
LOCATE
ELECTRICAL
OUTLET
WITHIN
THESE
AREAS.
(Verify
location
will not
interfere
with duct,
mounting
brackets,
and flue.)
BACK OF
HOOD
10”
INSTALL THE WIRING
Page view 6
1 2 3 4 5 6 7 8 9 10 11 12 ... 23 24

Comments to this Manuals

No comments